Log in

Login to your account

Username
Password *
Remember Me

Ground Water Measurement

Some resource consents require the standing water level to be measured once every calendar month after pumping has ceased for at least 24 hours; or the period of time required for 95% recovery of the pumping induced drawdown.

A physical measurement is required and not an air line/pressure measurement.

HydroServices has precise measuring equipment to:

  • Ensure clearance between well casing and rising column.
  • Probe and accurately measure water below ground level.
  • Provide monthly measurements and file with ECan on request.