Some resource consents require the standing water level to be measured once every calendar month after pumping has ceased for at least 24 hours; or the period of time required for 95% recovery of the pumping induced drawdown.
A physical measurement is required and not an air line/pressure measurement.
HydroServices has precise measuring equipment to:
> Ensure clearance between well casing and rising column.
> Probe and accurately measure water below ground level.
> Provide monthly measurements and file with ECan on request.
|